Also Effortlessly Complete C_TSCM42_65 SAP Test Inside Day or two regarding Preparing Acquire Fantastic Aid regarding On the web

$
0
0

We all ensure you you will complete C_TSCM42_65 sample questions together with reason test even with a really small preparing. And also our own professionals and also C_TSCM42_65 inquiries together with reason specialists constantly test their utmost to fix the difficulties which can be questioned from the consumers about C_TSCM42_65 ANALYZE. We all give you substantial information and also each depth needed to acquire the particular analyze. If you’d like several course regarding qualified inside analyze next have the newest C_TSCM42_65 coming from bookmarking sites test human brain on the web powerplant produced by professionals in which enables you to complete C_TSCM42_65 inquiries together with reason cert without the problems. With PASSLEADER we have been focused on the continuous accomplishment.

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION 2
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

QUESTION 3
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: BCE

QUESTION 4
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: BDE

QUESTION 5
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: BD

QUESTION 6
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C